Shortening the project from 120 to 42 days
Case Studies
Interstate 25, a major highway through Colorado, has some of the oldest segments of freeway in the state. It was originally built in the 1950s and no efforts to modernise it were made until recently.
The Colorado Department of Transform…
No room for error at 322 km/h
Case Studies
Racetracks are often one of the most demanding jobs. The paving needs to be smooth - at 322 kilometres per hour (or 200 miles per hour) there is no room for error.
Scotty’s Contracting & Stone were well aware of this when constructing…
Shortening jobs from 5 days to 3 and a half
Case StudiesDanielle from SITECH UK & Ireland talks about their customer, Phil Dalby Excavation Services, and its adoption of the Trimble 2D Flex System.
Phil Dalby Excavation Services run a small excavator for things like patios, drainage, driveways,…
Tight tolerances required for airport repaving
Case StudiesSuit-Kote won the job of resurfacing the 2 126meter long by 45 meter wide Ithaca-Thompkins airport runway. The Federal Aviation Administration mandates tight tolerances for airports. This combined with a tight deadline, the airport was shut…
Planning For the Road Ahead
Case StudiesProject Company, Brenner Basistunnel BBT SE was able to avoid major errors, whilst saving time and money by revising their scheduling solution early.
The Brenner Pass is infamous for its traffic jams, being the primary connection between…